Spend More on Renovation, Keep Less? A Mortgage Broker Runs the Numbers

A bigger renovation budget does not automatically mean more money in your pocket. As a broker I see the valuation reports after the work is done, and the gap between what people spent and what they got back surprises them every time.

The $50,000 renovation that left you $7,000 worse off

Say your property is worth $900,000 today and you have three options.

  1. Sell as it is for $900,000.
  2. Spend $8,000 on a targeted tidy-up. It now sells for $925,000. You are $17,000 ahead.
  3. Spend $50,000 on a bigger renovation. It now sells for $960,000. You are $10,000 ahead.

Option three got the highest sale price. It also left you $7,000 worse off than option two, after more work, more money and more stress. So don’t just ask how much you can sell it for. Ask how much you will eventually keep.

Every street has a ceiling

Buyers don’t care what you spent. They compare your place with similar renovated properties that sold nearby in the last three to six months. If those sold for $960,000, that is your ceiling. You can spend $50,000 or $90,000 getting there and the ceiling doesn’t move. Expensive finishes won’t turn a $960,000 street into a $1.1 million sale. The only thing that pushes through the ceiling is more usable space: an extension, an extra bedroom or bathroom.

So before you talk to a builder, do the comparables yourself. That number is your boundary, not the builder’s quote.

What buyers actually notice

Not the heated floors or the rainfall shower. They ask three simple questions: Is it modern? Is it clean? Is it going to be a pain to maintain? Extra features might impress people, but the question is whether they will pay extra for them because you paid for them.

Kitchens are the classic trap. A mid-range kitchen that matches the street usually gets a better result than a dream kitchen in a mid-range street. If the bathroom is tired and dated, do it, but don’t spend hotel money where the buyers aren’t paying hotel prices.

How an $8,000 job becomes $40,000

You replace the benchtop. Now the cabinets look old, so you replace those. Now the floor doesn’t match the cabinets. And while the kitchen is pulled apart, you may as well move the sink. Before you start, write down two lists: what you are going to fix, and what you are going to leave alone. If you can’t write the second list, you are not ready to start.

The three boxes

  1. Essential repairs. The leak, the electrical fault, the damaged floor. These don’t add value, but they protect your downside. A buyer who sees a water stain on the ceiling is thinking “is that a $500 job or a $15,000 job?” and either offers less to be safe or walks away. Find the cause and fix it properly.
  2. Presentation. Cleaning, decluttering, the garden, a paint touch-up, getting oversized furniture out so the rooms feel bigger. This is what lets buyers see what is good about the place.
  3. Upgrades. The new kitchen, the extra bathroom, the extension.

It is easy to jump straight to box three. Do boxes one and two first. Very often that is where the better outcome is.

Are you renovating to keep, or to sell?

If you are keeping the home for the next ten years, spend on the things your family will actually use and enjoy. You don’t have to recover every dollar. If you are selling in three months, the only question is whether the buyer will pay more than the renovation costs. Both are fine. They are just different decisions. Spend money on what you enjoy, but don’t put it in a spreadsheet and call it an investment.

Renovating to pull out equity

Most people who ask me this aren’t selling at all. They want to refinance after the renovation and release equity. Two things decide whether that works: the valuation the bank actually comes back with, and whether you have the borrowing capacity to take the money out.

Say the property is worth $900,000 with a $720,000 loan, so 80% LVR. You spend $50,000 and it values at $960,000. At the same 80%, the maximum loan is $768,000. You put in $50,000 cash and can get back $48,000 as equity, and only if your income supports the bigger loan. Don’t commit the cash assuming you can always get it back out. Run the numbers first, especially the borrowing capacity.

You can get a rough picture in a couple of minutes with our equity calculator and borrowing power calculator.

Run three scenarios before you sign anything

Sell as is. Targeted cosmetic work. Full upgrade. For each one, write down the budget, the value you expect to add and how long it will take. Then stress it: if you spend $45,000 and add $60,000, you are $15,000 ahead. If the cost drifts to $50,000 and the value only lifts $50,000, you have done months of work for nothing.

Buyers can admire your renovation. The question is whether they will pay for it. So before you spend a dollar, ask two things: will this make the buyer pay more, and what will it actually cost me to deliver?

Thinking about renovating to sell or to release equity? Let’s run your numbers before the builder does. Book a free 30-minute strategy session or call us on 0468 051 171.

Tags :

Facebook
Twitter
LinkedIn
Pinterest
Picture of David Spangler
David Spangler

Habitasse habitant laoreet odio hendrerit ridiculus massa cursus suscipit hac arcu. Aliquam convallis dignissim faucibus neque gravida ex.

AUTHOR